Ctrl + Build: Copy. Paste. Power Up. – Why Standardisation Gives Data Centre Builders an Edge
Last Updated May 23, 2025
Last Updated May 23, 2025

In a high-stakes race to deliver digital infrastructure, standardisation reduces risk, improves quality and gives project teams the “right-first-time” advantage.
Cranes on skylines from London to Leeds tell the story: the data centre boom is on.
The UK data centre construction market is currently estimated at around £13.5 billion. Some forecasts suggest it could exceed – almost doubling within a decade.
Table of contents
A Boom Without a Blueprint
The skyline shift is borne out by the data. , 150 zettabytes of data was consumed globally in 2024, and is expected to almost double to 394 zettabytes by 2028. To put that into perspective, that's 433,207,581,343,744 gigabytes.
And yet, amid all this activity, one thing is missing: a blueprint.
There’s no standard approach, every design is different. Every project team does it differently. Every builder has their own process and software. Every project has its own quirks.
Simon Baker
鶹Ƶ
That might sound like innovation – but it’s not. It’s risk.
As builds scale and complexity rises, the absence of repeatable systems multiplies friction, confusion and cost. As digital demand accelerates, a bespoke-by-default mindset just won’t cut it.
There’s no standard process for data centre construction. That’s a huge challenge as we scale to meet demand.
Simon Baker
鶹Ƶ
Why Repeatability Matters
Standardisation is the secret to scaling safely and predictably.
In other asset classes – think logistics parks, hospitals or schools – standardisation enables faster builds, lower costs and tighter quality control. The same is true for data centres.
And with data centre owners under pressure to deliver at speed while meeting exacting performance standards, predictable outcomes are non-negotiable.
Repeatable workflows also support smoother onboarding, cleaner handovers and stronger sustainability outcomes – especially when digital verification and audit trails are embedded from day one.
Counting the Cost of Complexity
Standardisation is often framed around time and quality benefits, but the cost case is just as compelling.
, the United Kingdom is now the third-most-expensive market in Europe for data centre development – behind only Switzerland and Norway.
UK construction costs are predicted to rise by 17% over the next five years, according to BCIS. Average costs per megawatt ranges from £7 million to £13 million, and high-spec builds in London and Manchester can reach even higher than that.
These figures capture more than steel and structure. They reflect an ever-growing slice of spend funnelled into services – mechanical, electrical and plumbing (MEP), cooling, fire-protection systems – along with cost overruns from rework, scope creep and duplicated effort.
With skilled contractors commanding a premium, complexity adds even more to the bill.
How to Break the Bespoke Cycle
If every data centre has the same objective – a secure, reliable facility to store data – why are no two builds alike?
There are several reasons, Simon Baker reflects. Each site introduces unavoidable regulatory, climate and infrastructure variables.
But the industry is young, with few shared delivery norms. Operators compete on innovation, using new design features – whether that’s immersion cooling or natural air filtration – as market differentiators. Overall, there’s a long-held belief that bespoke design equals competitive advantage.
Simon Baker
鶹Ƶ
But as digital infrastructure matures, leading developers are shifting focus – from ‘one-of-a-kind’ to one-way-to-build.
Outcome is the same. Delivery’s the difference. And every difference adds cost.
Simon Baker
鶹Ƶ
Custom builds often rely on legacy habits or informal knowledge – the site manager’s spreadsheet, the subcontractor’s paper checklist.
That might work once. But it will not necessarily work twice.
When projects lack shared templates and structured workflows, mistakes get repeated, not resolved. Finger-pointing replaces accountability. Quality slips. And the bottom line suffers.
In contrast, a consistent process – delivered through a shared platform – reduces rework, clarifies responsibility and embeds trust.
Standardisation in Action
Some of the world’s largest technology companies are beginning to mandate standardisation.
Maryrose Walsh, Enterprise Solutions Engineering Manager with 鶹Ƶ, is working with one global technology company that requires all contractors to use 鶹Ƶ for quality assurance – across every data centre, in every region. The goal? Build it right first time.
Some of 鶹Ƶ’s clients are managing dozens of builds across as many countries, each with different contractors and project-management teams. But they’ve created a single source of truth.
Maryrose Walsh
The benefits are immediate:
- A consistent quality assurance process across contractors
- Real-time dashboards to track progress and flag delays
- Digital inspection and defect management tools to reduce onsite paperwork
- Faster commissioning and fewer surprises during handover.
When you build it right first time, you don’t just save money. You build trust.
Maryrose Walsh
Hyperscale Hypothetical
Many data centre developers are shifting towards repeatable, modular construction models.
Off-site fabrication allows for site preparation and construction to run in parallel – shaving weeks or even months off project timelines. Pricing is locked in early and material waste is minimal.
Controlled factory environments deliver consistent outcomes, lowering the risk of on-site defects. And with less work done on site, modular methods reduce exposure to bad weather, safety incidents and rework.
Repeatable designs can be deployed rapidly across regions, giving data centre owners a competitive edge as they expand.
Here’s what this could look like in practice. Imagine a global tech company plans to roll out five hyperscale data centres across the EMEA region. To accelerate deployment, a modular construction model is adopted:
- Standardised shell: Each facility uses precast concrete panels and prefabricated steel frames, manufactured centrally and trucked to site.
- Plug-and-play mechanical pods: HVAC, cooling and power units arrive as complete modules, craned into place and connected via standard interface kits.
- Digital twin alignment: Every module is tracked and quality-assured in 鶹Ƶ against the same digital model, ensuring consistency across all five builds.
- Commissioning checklists: The team uses identical quality assurance templates at each site, with learnings captured in real time to improve subsequent builds.
The result? Less rework. Faster handover. Lower risk. And a scalable, consistent approach that’s ready to roll out again.

Source: Adapted from , 2020.
What Data Centre Developers Should Do Next
Every bespoke decision adds complexity. Standardisation reduces risk, cost and time. 鶹Ƶ helps enforce consistency across builds — wherever, and whoever, is on site.
Simon Baker
鶹Ƶ
Standardisation supports cost predictability – but only if it’s deliberate. Here’s how developers can lead the shift:
- Mandate software in contracts: Require digital tools like 鶹Ƶ for quality assurance, documentation and reporting
- Use consistent templates: Create a standard library of forms, inspection test plans (ITPs), and handover checklists
- Link performance to incentives: Embed rework rates and RFT (right first time) metrics in contracts with builders and subcontractors
- Centralise oversight: Feed quality assurance and commissioning data into real-time dashboards for enterprise-wide transparency
- Insist on digital handover: Structured, digital quality assurance processes ensure nothing gets lost in transition from build to operation.
Categories:
Tags:
Written by
Simon Baker
Simon Baker is a Solutions Engineer at 鶹Ƶ Technologies, where he helps construction businesses across Australia and New Zealand drive efficiency and innovation through technology. Before joining 鶹Ƶ, Simon built a strong foundation in the construction industry, working as a Service Coordinator at Construction Services and Infrastructure, where he was involved in delivering Data Centre projects across Australia. Earlier in his career, Simon spent nearly eight years as an electrician at Castle Electrical & Solar, where he completed his apprenticeship and led residential and commercial projects, including level 2 electrical works and solar and battery installations. With hands-on project management experience and a deep understanding of building services, Simon is passionate about empowering construction teams to deliver better outcomes through smarter processes and technology.
View profileMaryrose Walsh
Maryrose is the Manager of Enterprise Solutions Engineering at 鶹Ƶ and is dedicated to transforming the construction industry through innovative technology solutions. With a life long career in Pre Sales spanning many industries, she has a strong technical foundation in software architecture, integration, and scalable platforms. Bringing this rich experience to 鶹Ƶ, Maryrose excels at aligning complex solutions with the real-world needs of construction businesses through her customer first mindset and strategic approach. With her passion for driving innovation and efficiency, she is dedicated to collaborating with construction organisations to achieve transformative outcomes through technology.
View profileReviewed by
Nicholas Dunbar
42 articles
Nick Dunbar oversees the creation and management of UK and Ireland educational content at 鶹Ƶ. Previously, he worked as a sustainability writer at the Building Research Establishment and served as a sustainability consultant within the built environment sector. Nick holds degrees in industrial sustainability and environmental sciences and lives in Camden, London.
View profileExplore more helpful resources

Ctrl + Build: The Carbon Code – Why Embodied Emissions Are The Next Big Test For Data Centre Builders
Data centre operators are under pressure to decarbonise – and operational efficiency is no longer enough. The carbon locked into construction materials is now under the spotlight. For builders, that...

Ctrl + Build: Running on Zero – Why Energy Efficient Data Centres Start with Design.
As power-hungry data centres multiply, builders must play a bigger role in reducing emissions by digitally tracking every delivery milestone. The age of AI is here — and it runs...

Ctrl + Build: The Data Centre Balancing Act – Why Commissioning Risk is the Biggest Blind Spot in Today’s Builds
This is the first instalment of Ctrl + Build — 鶹Ƶ’s new series exploring the fast-moving, complex, high-stakes world of data-centre construction. From commissioning risk to carbon strategy, we’re uncovering...

Construction Procurement Strategy, Methods and Processes
Every successful construction project depends on securing the right materials, labour, and services at precisely the right time and cost. Procurement serves as the engine that drives this coordination, quietly...